    Fire protection knowledge of cable laying

    PubDate:2020-03-23Author:Sources:Views:3293


    CableLaying fire prevention knowledge

    1. Choose flame-retardant wires and cables

    Fireproof mechanism of flame-retardant wires and cables:Under the heat of the combustion reaction, the flame retardant in the condensed phase thermally decomposes and absorbs heat, which slows down the temperature rise in the condensed phase and delays the thermal decomposition rate of the material. At the same time, it releases a chain reaction free radical blocker to make The branch interruption of flame and chain reaction slows down the gas phase reaction speed, prevents the temperature rise in the condensed phase, and achieves the fire prevention effect;

    Classification and selection of flame-retardant wires and cables:Flame-retardant cables mainly include ordinary flame-retardant wires and cables, halogen-free low-smoke flame-retardant cables, low-halogen low-smoke flame-retardant cables, and fire-resistant cables. These products have different manufacturing technologies, performance characteristics, and application ranges.





    2. Scientific design and installation

    Blocking:Fire blocking is to use fire blocking materials to block the gaps where the cables pass through to prevent the cables from catching fire and prolonging combustion. The connection between the cable trench and the electrical panel, box, cabinet, partition wall, floor slab, etc. must be flame-retardant plugging. The cable fire door should be closed for a long time, and the gap between the cable fire board and the cable trench cover should be closed.Use soft plugging material to seal tightly at densely laid cables

    Separate:The fire partition wall can divide the long cable tunnel and the cable channel into small sections to narrow the fire area. Fire-resistant partitions, aluminum silicate fiber felt, fire-resistant blocking materials, fire-resistant coatings, etc. can be used. The fire partition wall is made of slag wool, and it is used in the tunnel with the fire door;

    Coating:Applying fire-resistant paint can prevent the cable from burning after fire. The fire-resistant and flame-retardant tape is easy to construct, not easy to fall off, has strong adaptability, and is cheap.In the part of the cable entering the cabinet to the terminal head, paint all cables with fire-retardant paint or wrap fire-retardant tape twice in the area of 2 to 3 meters on both sides of the fire-proof partition wall.





    3. Set up fire prevention facilities

    Set up the fire alarm system: According to the actual situation, select the appropriate alarm probe and the alarm system suitable for the characteristics of the cable layer. At present, the linear (or cable-type) temperature-sensing detector is widely used in cable trenches and pipeline wells. ;

    High-pressure water spray fire extinguishing: High-pressure water spray fire extinguishing methods should be adopted in cable corridors and densely cabled areas. In order to make water spray fire extinguishing work in a timely and effective manner, a high-sensitivity monitoring and control system is required;

    Strengthen the ventilation of the cable layer (well): Using natural ventilation conditions, set up vents on the cable layer as close to the outer wall as possible. At the same time, a mechanical smoke exhaust system with uninterrupted power supply should be established to pass automatic The alarm linkage turns on the exhaust fan.





    4. standardize daily management



    Maintain a good operating condition: to prevent defects, aging, moisture, damage, etc. due to the internal insulation of the cableThe cable's own fault causes the cable to be short-circuited, and the arc is fired. The cable with poor insulation is found in time, and it is taken out of operation;


    Maintain a good operating environment: It is strictly forbidden for waste gas and waste water from the thermal system to flow into the cable trench and cable tunnel;



    Strengthen the monitoring and management of cable heads: Cable heads are the weak link of the cable insulation due to many factors, and the power cable terminal heads and middle parts placed in the cable trenches, cable tunnels, cable trough boxes, and cable interlayers The joints must be registered and supervised to prevent the cable hair from catching fire during operation.




    Note: This article is reprinted as a network resource. If you have any copyright infringement, please contact the administrator to delete it!


    分享到:
    主站蜘蛛池模板: 波多野结衣一区二区三区四区视频| 亚洲欧美一区二区三区蜜芽| 国产精品女在线观看| 亚洲免费人成影院| 欧美视频在线不卡| 97青青青国产在线播放| 中文字幕在线欧美| 国产一区二区三区在线精品专区| 72种姿势欧美久久久大黄蕉| 国产精品xxx| 亚洲国产清纯| 天堂va亚洲va欧美va国产| 国产精品lululu在线观看| 亚洲国产精品人久久电影| 无码AV高清毛片中国一级毛片| h视频在线观看网站| 国产高清又黄又嫩的免费视频网站| 九九热在线视频| 免费99精品国产自在现线| 亚洲一区二区在线无码| 欧美日韩中文字幕在线| 草逼视频国产| 精品一区二区三区无码视频无码| 精品国产香蕉在线播出| 亚洲色图在线观看| 丰满人妻一区二区三区视频| 免费无码又爽又黄又刺激网站 | 尤物在线观看乱码| 国产精品妖精视频| 欧美日韩国产精品va| 久久久久久高潮白浆| 国产福利在线观看精品| 四虎影视8848永久精品| 国产精品中文免费福利| 久久性妇女精品免费| 美女毛片在线| 青草午夜精品视频在线观看| 国产拍揄自揄精品视频网站| 亚洲国产日韩在线成人蜜芽| 亚洲成A人V欧美综合天堂| 久久婷婷国产综合尤物精品| 日本一区二区三区精品视频| 久久久国产精品无码专区| 午夜精品影院| 久久久久无码精品| 久久精品人人做人人综合试看| 国产激情在线视频| 亚洲视频二| 三级国产在线观看| 免费高清自慰一区二区三区| 久久精品国产91久久综合麻豆自制| 永久天堂网Av| 欧美精品在线观看视频| 欧美一级99在线观看国产| 久久99国产综合精品1| 免费国产黄线在线观看| 麻豆精选在线| 中文成人无码国产亚洲| 欧美中文字幕一区二区三区| 亚洲人在线| 亚洲国产理论片在线播放| 国产视频一二三区| 91年精品国产福利线观看久久| 欧美日韩亚洲综合在线观看| 国产精品自拍合集| 亚洲第一区精品日韩在线播放| 在线欧美a| 亚洲精品麻豆| 美女啪啪无遮挡| 好紧太爽了视频免费无码| 亚洲A∨无码精品午夜在线观看| 亚洲国产黄色| 中文字幕无码制服中字| 高清不卡一区二区三区香蕉| 国产乱人免费视频| 国产95在线 | 亚洲香蕉伊综合在人在线| 国产99欧美精品久久精品久久| 免费看久久精品99| 精品久久综合1区2区3区激情| 色综合久久综合网| 视频二区欧美|