    Technical requirements for laying of wires and cables in common engineering

    PubDate:2018-12-08Author:Sources:Views:3848

    Technical requirements for laying of wires and cables in common engineering



    1. Technical requirements for wire connection


    2. Color marking of insulated conductors or bare conductors in the line


    Third, the laying requirements of power cables


    Fourth, the type of commonly used wire


    5. Laying of commonly used cables



    1. Technical requirements for wire connection


    1. The crimping method should be adopted for the connection of the wire in the box or the box. Terminals and copper (aluminum) sleeves, clamps, etc. can be used for connection. The copper core wire can also be connected by winding and tinning; single strand aluminum The core wire should be connected by insulated screw connection buttons, and welding connection is forbidden.


    2. The connection between the wire and the terminal of the electrical appliance


    Single-strand copper (aluminum) core and multi-strand copper-core wires with a cross-section of 2 mm2 and below can be directly connected, but the core of multi-strand copper-core wires should be tightened first. Connect after enamelling.


    Multi-strand aluminum-core wires and multi-strand copper-core wires with a cross-section of more than 2.5 mm2 should be crimped to the terminals and then connected to the terminals of electrical appliances (except for the plug-in terminals that come with the equipment).


    3. Reliable transition measures should be taken for the connection of copper and aluminum wires. Copper and aluminum transition terminals, copper and aluminum transition sleeves, copper and aluminum transition clips, etc. can be used for connection. Copper and aluminum terminals should be tinned when connecting copper and aluminum terminals. deal with.


    4. When using the crimping method to connect the wires, the specifications of the copper (aluminum) bushing and die of the terminal should be consistent with the cross-section of the core.


    5. Acid flux should not be used when tinning copper core wires and copper terminals.



    2. Color marking of insulated conductors or bare conductors in the line


    1. AC lower phase line:


    L1. The phase is yellow; the L2 phase is green; the L3 phase is red; the neutral wire is light blue; the protective ground wire (PE wire) is yellow and green.


    2. DC line: the positive pole (+) is brown; the negative pole (one) is blue; the grounding neutral line is light blue.


    3. The green and yellow two-color wire is only used to mark the protective grounding and cannot be used for other purposes. Light blue is only used for the neutral or middle line.


    4. The color mark can be marked on the entire length of the conductor with the specified color or the insulation color of the insulated conductor, or it can be marked on the selected easily recognizable position (such as the end or the accessible part).



    3. the laying requirements of power cables


    1. Before laying, calculate the length of each cable according to the design and actual path, arrange each cable reasonably, and reduce cable joints.


    2. Reliable safety measures should be taken for laying cables in live areas.


    3. The power cable should have a spare length near the terminal head and the joint.


    4. The distance between the supporting points of the cable should meet the design regulations. When the design is not specified, the length shall not be greater than the value listed in Table DQ5-1.


    Distance of cable support point


    5. The minimum bending radius of the cable should meet the requirements of Table DQ5-2.


    Cable minimum bending radius table


    6. When laying the cable, the cable should be led out from the upper end of the reel, and the cable should not be dragged by friction on the support and the ground. The cable shall not have any unremoved mechanical damages such as flattening, twisting of the cable, or breaking of the sheath.


    7. The layout of power cable joints should meet the following requirements:


    1) For cables laid side by side, the positions of their joints should be staggered with each other.


    2) The joints of the cable should be fixed with a pallet.


    3) There should be a protective box to prevent mechanical damage outside the directly buried cable joint box (except the epoxy resin joint box). The protective box located in the frozen soil layer should be filled with asphalt.


    8. When laying cables, they should be neatly arranged, not crossed, fixed, and signs should be installed.


    9. The installation of the sign board should meet the following requirements:


    1) Cable terminals, cable joints, bends, mezzanine, both ends of tunnels and shafts, manholes, etc., shall be equipped with signs on the cables.


    2) The line number should be indicated on the sign. When there is no serial number, the cable model, specification and starting and ending location should be stated; the cables used in parallel should have a serial number. The handwriting of the sign board should be clear and not easy to fall off.


    3) The specifications of signs should be unified. The sign board should be anticorrosive, and the hanging should be firm.


    10. The cables should be fixed in the following places:


    1) Vertical laying or more than 45. Cables laid obliquely on each support; every 2m on the bridge;


    2) For cables laid horizontally, at the first and last ends of the cable and at both ends of the turn and the cable joint; when the cable spacing is required, every 5-10m;


    3) The fixing of single-core cables should meet the design requirements.


    11. In the following locations, the cable should have a protective tube with a certain mechanical strength or a protective cover:


    l) Cables enter buildings, tunnels, through floors and walls.


    2) The section leading from the channel to the poles, equipment, the outer surface of the wall or the place where pedestrians in the house can easily approach, and the height below 2m from the ground.


    The depth of the protection pipe buried in the non-concrete ground shall not be less than 100 mm; the length of the protruding water slope of the building shall not be less than 250 mm. The root of the protective cover should not be higher than the ground.


    12. The following measures should be taken to prevent fire and flame retardancy of cables:


    1) When the cable passes through the shaft, wall, floor or into the hole of the electrical panel or cabinet, seal it tightly with fire-proof plugging material.


    2) In important cable trenches and tunnels, install fire barriers in sections or use soft refractory materials as required.


    3) For important circuits, it can be laid separately in a special channel or in a fire-resistant enclosed tank, or fire-resistant paint can be applied to it


    4) Apply fire-resistant paint or fire-resistant tape on both sides of the power cable joint and adjacent cables 2 to 3m in length.


    5) Use fire-resistant or flame-retardant cables.


    6) Set up alarm and fire extinguishing devices.


    13. When plugging cable holes, the plugging should be firm and reliable, and there should be no obvious cracks and visible pores. If the holes are larger, refractory lining should be added before plugging.



    4.commonly used wire models



    Common wire model


    Five, commonly used cable models



    分享到:
    Keywords:
    主站蜘蛛池模板: 免费jizz在线播放| 午夜国产精品视频黄| 99视频在线看| 亚洲婷婷在线视频| 一本大道香蕉高清久久| 免费无码又爽又黄又刺激网站| 一本久道久久综合多人| 热久久这里是精品6免费观看| 日韩欧美中文| 本亚洲精品网站| 欧美国产在线一区| 亚洲视屏在线观看| 欧洲亚洲一区| 国产97公开成人免费视频| 欧美另类第一页| 久久亚洲黄色视频| 99久久99视频| 婷婷六月在线| 亚洲人成影院在线观看| 五月天综合网亚洲综合天堂网| 婷婷六月天激情| 国产第一页屁屁影院| 欧美一级高清片欧美国产欧美| 日韩精品欧美国产在线| 国产日韩久久久久无码精品| 国产人免费人成免费视频| 免费va国产在线观看| 国产在线精彩视频二区| 51国产偷自视频区视频手机观看| 激情爆乳一区二区| 午夜精品区| 婷婷激情五月网| 亚洲精品无码久久毛片波多野吉| 亚洲天堂区| 国产剧情伊人| 国产精品香蕉在线观看不卡| 日本三级欧美三级| 亚洲网综合| 黄色网址手机国内免费在线观看| 国产成人一区在线播放| 99热这里只有精品免费国产| 久久久久人妻一区精品色奶水 | 无码高潮喷水在线观看| 欧美午夜性视频| 制服丝袜 91视频| 国产主播一区二区三区| 久久中文无码精品| 五月婷婷伊人网| 青青草国产在线视频| 亚洲成人在线免费| 欧美在线视频不卡第一页| 91精品国产一区自在线拍| 国产精品一区不卡| 91小视频在线播放| 亚洲国产欧美国产综合久久| 亚洲人成电影在线播放| 四虎永久免费在线| 免费观看精品视频999| 不卡无码网| 激情六月丁香婷婷四房播| 亚洲狠狠婷婷综合久久久久| 亚洲愉拍一区二区精品| 草草影院国产第一页| 小说区 亚洲 自拍 另类| 亚洲日韩第九十九页| 秘书高跟黑色丝袜国产91在线| 国产乱子伦无码精品小说| 啦啦啦网站在线观看a毛片| 99尹人香蕉国产免费天天拍| 奇米影视狠狠精品7777| 国产一二三区在线| AV网站中文| 亚洲美女高潮久久久久久久| 中国国产高清免费AV片| 久久伊人操| www.精品视频| 国产成人你懂的在线观看| 91久久偷偷做嫩草影院精品| 国产区免费精品视频| 亚洲福利片无码最新在线播放 | 97免费在线观看视频| 国产在线视频欧美亚综合|